📋 Case Study

Open Pit Gold Mine Blast Optimization with Community Vibration Consent

Community opposition due to unmonitored blast vibrations damaging adobe homes and sacred sites

🏗️ Project Overview

La Arena Gold Mine, Peru – Expansion Phase II

🎯 Challenge

Community opposition due to unmonitored blast vibrations damaging adobe homes and sacred sites

🔧 Design Approach

Integrated participatory vibration monitoring network co-installed with local technicians; blast design revised using real-time feedback and heritage-sensitive delay sequencing

📐 Key Calculations

Peak Particle Velocity (PPV) Threshold

PPV = k × (D/R)^n
Result: 1.2 cm/s max at heritage site boundary
Aligned with UNESCO vibration limits for earthen structures

Community Monitoring Coverage

Sensors per km² × Local Technician Certification Rate
Result: 8 sensors + 12 trained locals
Ensured data sovereignty and trust

📊 Results

98% community acceptance of blast schedule; 40% reduction in vibration complaints; UNESCO recognized co-monitoring as best practice

💡 Lessons Learned

  • Co-installed sensors increased data legitimacy
  • Training locals created long-term capacity
  • Delay sequencing must respect ceremonial calendars

Key Takeaways

  • 1Co-installed sensors increased data legitimacy
  • 2Training locals created long-term capacity
  • 3Delay sequencing must respect ceremonial calendars