πŸ“‹ Case Study

Underground Limestone Mine Ventilation Duct Inspection

Manual inspection of 4 km of 1.2 m diameter ducting in confined, low-light, high-dust environment posed fall and respiratory hazards

πŸ—οΈ Project Overview

Michigan Limestone & Chemical Co., Rogers City, MI

🎯 Challenge

Manual inspection of 4 km of 1.2 m diameter ducting in confined, low-light, high-dust environment posed fall and respiratory hazards

πŸ”§ Design Approach

Custom VTOL drone with IP67-rated thermal + RGB payload; SLAM navigation in GPS-denied tunnels; AI-powered tear/seam detection trained on 2,400 annotated frames

πŸ“ Design Diagram

Underground Limestone Mine Ventilation Duct Inspection1.2 m Ø duct (4 km total)VTOL DroneThermal + RGBIP67-ratedSLAM NavGPS-deniedAI Detection2,400 framesΞ”T > 4Β°Cβ†’ breachInspection Rate:1.8 km/hrFall & RespiratoryHazards (Manual)

AI-generated project design illustration

πŸ“ Key Calculations

Thermal Delta Threshold

Ξ”T > 4Β°C indicates insulation breach
Result: 6.8Β°C
Correlated with 92% of airflow leaks

Inspection Coverage Rate

Linear km/hr
Result: 1.8 km/hr
3Γ— faster than rope-access teams

πŸ“Š Results

Reduced inspection cycle from 14 days to 36 hours; identified 17 critical breaches previously missed; zero lost-time incidents over 18-month deployment

πŸ’‘ Lessons Learned

  • β€’SLAM drift accumulates beyond 800 mβ€”requires periodic visual loop closure
  • β€’Dust deposition on lenses mandates real-time auto-clean cycles every 90 sec

βœ… Key Takeaways

  • 1SLAM drift accumulates beyond 800 mβ€”requires periodic visual loop closure
  • 2Dust deposition on lenses mandates real-time auto-clean cycles every 90 sec