Underground Limestone Mine Ventilation Duct Inspection
Manual inspection of 4 km of 1.2 m diameter ducting in confined, low-light, high-dust environment posed fall and respiratory hazards
ποΈ Project Overview
Michigan Limestone & Chemical Co., Rogers City, MI
π― Challenge
Manual inspection of 4 km of 1.2 m diameter ducting in confined, low-light, high-dust environment posed fall and respiratory hazards
π§ Design Approach
Custom VTOL drone with IP67-rated thermal + RGB payload; SLAM navigation in GPS-denied tunnels; AI-powered tear/seam detection trained on 2,400 annotated frames
π Design Diagram
AI-generated project design illustration
π Key Calculations
Thermal Delta Threshold
ΞT > 4Β°C indicates insulation breach
Result: 6.8Β°C
Correlated with 92% of airflow leaks
Inspection Coverage Rate
Linear km/hr
Result: 1.8 km/hr
3Γ faster than rope-access teams
π Results
Reduced inspection cycle from 14 days to 36 hours; identified 17 critical breaches previously missed; zero lost-time incidents over 18-month deploymentπ‘ Lessons Learned
- β’SLAM drift accumulates beyond 800 mβrequires periodic visual loop closure
- β’Dust deposition on lenses mandates real-time auto-clean cycles every 90 sec
β Key Takeaways
- 1SLAM drift accumulates beyond 800 mβrequires periodic visual loop closure
- 2Dust deposition on lenses mandates real-time auto-clean cycles every 90 sec